I wanted to get the bathroom repaired before November, since we are having three different events at our house then. Otherwise, it would wait until Spring.

The project was supposed to be:
Remove wallpaper
Paint

The project turned into:
Remove wallpaper
Remove next layer of wallpaper
Remove drywall (It wasn't properly prepped and started falling apart in step 2)
Replace drywall
Mud and Tape
Sand
Patch walls
Sand
Patch walls (due to shrinkage)
Sand
Prime
Scrape ceiling
Patch ceiling
Patch walls (a few dings that weren't visible until primed)
Sand ceiling
Sand walls
Prime ceiling
Prime walls
Patch walls (ladder dings from priming ceiling and a few final tiny dings)
Sand walls
Prime those spots
Paint ceiling
Paint walls

So now we have two more coats to go on the wall (we're painting it a deep red), but it's almost done! A one day job is now on it's 4th week. Gotta love home improvement.

I'll show before and after pics this weekend